The change orders are already in the documents.
Each bid set carries scope nobody priced and conditions nobody surveyed. We audit the whole set at each step of the bid cycle and on into construction. We flag the risks that help you determine risk tolerance and margin.
Public and private construction projects nationwide.
Eight places the money moves after award…
Each accepted review covers all eight. The purchased tier determines which findings and supporting outputs you receive, including potential responsibility issues for further review.
Biddability
Can this set be bid consistently? When the language is too loose to price, each bidder guesses — and the ones who guess high lose the job. Knowing exactly where the looseness sits lets you bid the documents as written instead of padding blind.
Schedule
Is the work realistic within the contract time? Long-lead items, phasing through an occupied building, and whether the projected duration was drawn from the work or from a deadline.
Extended general conditions
Delay-related obligations, rate assumptions and document gaps that may affect extended general conditions. This is document review, not a project cost estimate.
Change-order prediction
Potential added-cost drivers: deferred, missing or conflicting scope, document-indicated existing conditions and clauses affecting cost allocation. We identify supporting sources and questions to clarify before pricing; we do not verify concealed physical conditions or determine a right to a change order.
Claims
Apparent inconsistencies, notice provisions and record requirements that may warrant clarification or professional advice. A finding is not a legal opinion or a determination of claim entitlement.
Constructability
Whether it can actually be built efficiently: diagrammatic drawings, constrained existing space, and trades routed into each other.
Financial
Potential cost drivers and their supporting documents. Full may include eligible per-finding historical ranges, with basis and limitations, or a withholding reason; these are not project-specific estimates.
Owner document readiness
Document coverage, missing information and coordination issues to resolve before bidding. A readiness indicator describes the review basis, not how the project will be administered or performed.
Three categories, severity ranked within each.
Released findings are named, cited to their sources and sorted into one of three categories, severity ranked. Readiness indicators or explanatory statuses describe the findings and coverage; they do not certify the set or predict its outcome.
Contract, commercial and administrative
The bid procedure, the contract terms and the front-end documents — what governs the award, and what you are agreeing to administer once you sign. Low risk cost impacts.
Document errors with no cost impact
Mistakes in the set that cost nothing to build but cost you time to resolve: a stale index, a wrong sheet reference, a section that contradicts its own title. Low risk cost impacts.
Cost, procurement, schedule and scope
Anything that moves money, the calendar, the scope or the way the work is procured. These are potential cost impacts. Full includes a historical range only where eligible support is adequate; otherwise the range is withheld with a reason.
A finding only reaches your report if it clears all three.
Each item is cited to a page for reference. If we cannot point at it in your documents, the report is not released.
It moves money or time. Interesting is not the bar; expensive is.
Your estimator would not have caught it in a normal read. We do not bill you for what you already know.
Everything else is suppressed. We would rather send you four findings you act on than forty you scroll past.
Three steps.
-
01
Send us the bid set and any other relevant documents.
Plans, specifications, addenda — however you have them. Drag the folder into the portal. No formatting, no file naming, nothing to learn. Large sets upload in pieces and resume if your connection drops. Before order acceptance, we verify the drawing and specification counts and confirm the document scope, fee and feasible delivery date. Uploading is not an accepted engagement.
-
02
We audit the whole set with Nemesis™
Each drawing against each specification section, the front-end documents against both, and each addendum against what it was meant to change. Nemesis™, our own software, reads the whole set across all eight checks above — then a person clears each candidate finding against the real / material / non-obvious standard before it reaches you.
-
03
You get the findings and the moves
The outputs included in your purchased tier, with human review and approval before delivery. Paid reports cite released findings and their potential implications; Full adds the qualified historical ranges, takeoff and draft communications described below. You and your advisers review the next steps.
Pythagoras provides construction document analysis and risk identification, not legal advice, claim entitlement, a cost estimate or licensed design services. Document-based accessibility and procurement checks cover only supported requirements and editions identified in the accepted order, with coverage, assumptions and unresolved applicability stated. They are not a compliance certification or site inspection. Draft RFIs, clarifications and priority suggestions require customer and professional review for facts, project context, contract requirements and deadlines before submission. We do not authorise a claim or a design or procurement-document change. The review covers the accepted document versions, not ongoing monitoring or later addenda unless agreed.
One price per bid set. No subscription.
One price per accepted set, with the size adjustment below. For an equivalent accepted document scope, the analytical review process is the same; tiers change the released deliverables. First pass is a summary, not the complete paid report. All tiers open together only after the complete promised scope is verified ready. Until then, requests are estimates only, not orders or delivery commitments. A request, upload or account approval alone is not an accepted engagement.
| First passFREEStart with the summary findings. | Basic$1,995/setSee everything we found, and where it is. | Full$4,995/setReview findings, quantities and draft clarifications. | |
|---|---|---|---|
| The verdict | |||
| Summary of apparent biddability issues | ✓ | ✓ | ✓ |
| How many material findings the set carries | ✓ | ✓ | ✓ |
| Readiness review indicator or explanatory status | Indicator / status | Indicator / status | Indicator / status |
| The findings | |||
| Each finding named and cited to the drawing and spec section | – | ✓ | ✓ |
| Potential cost, schedule and responsibility issues | – | ✓ | ✓ |
| Sorted into the three categories, severity ranked within each | – | ✓ | ✓ |
| Document-based accessibility review against requirements and editions identified in the accepted order | – | ✓ | ✓ |
| Eligible historical range per finding, or a withholding reason | – | – | ✓ |
| What to do about it | |||
| Draft RFIs, clarifications and priority suggestions for customer and professional review | – | – | ✓ |
| Complete, self-verified quantity takeoff for the accepted scope | – | – | ✓ |
| Supported jurisdiction-specific procurement document checks identified in the accepted order | – | – | ✓ |
| Delivery from completed intake | 2 business days | 5 business days | 10 business days |
| Start free | Choose Basic | Choose Full | |
Bigger sets
| Up to 100 drawings / 1,000 specification pages | Included |
| 101–150 drawings, or 1,001–1,500 specification pages | + one tier |
| 151–200 drawings, or 1,501–2,000 specification pages | + two tiers |
| Each further band | + one tier |
Before acceptance, we confirm verified counts, the size basis, any discount and the total fee. When drawings and specifications are both oversized, only the larger overage is charged. Accepted orders are not retroactively repriced.
You create an account once and it stays. Each bid set after that is priced on its own — there is nothing to cancel, and nothing renews. Business days run Monday through Friday, excluding observed U.S. federal holidays, in Eastern time. Completed intake means we have received and checked the agreed set and necessary information; the intake day is excluded. Before acceptance, we confirm a firm delivery date and feasibility against your disclosed bid, RFI or other deadline. Delivery is due by the end of that Eastern-time date unless an earlier time is agreed. There is no silent clock reset for retries, queues or reoffers; material changes require agreement. Delivery requires the approved report and required files by email, or accessible through the portal with notification. Incomplete files are not delivery.
A readiness score is a review indicator based on stated findings, coverage and scoring method, not a probability, completeness guarantee or prediction of project performance, and not a compliance certification. An explanatory status or withholding reason replaces a score whose basis is incomplete or misleading. No reported issue does not mean no issue exists. Full-only historical ranges describe the middle 50 percent of positive executed change-order amounts assigned to the relevant kind of change, with basis and limitations; they are not a project-specific estimate or a likelihood. A range is withheld without adequate eligible support. Finding ranges may overlap, must not be added and provide no aggregate exposure total, bid allowance or entitlement.
Full includes the complete, self-verified quantity takeoff for the accepted scope: included trades, document versions, units, measurement basis, assumptions, inclusions, exclusions, verification results and unresolved issues, in a ledger/workbook with supporting drawing evidence and a report summary. Self-verification is internal, not an independent certification and not a cost estimate; check quantities and assumptions before use. It cannot be labelled complete with unmeasured required scope or a blocking verification issue. Full also includes one consolidated addendum submission received within 30 calendar days after original report delivery, limited to the original accepted scope and its effects on the original findings and deliverables, with its delivery date agreed before starting. Redesign, new scope or further separate submissions require a new accepted quote. Correction of our own errors is separate and free and does not use up this reread. We correct our errors promptly; applicable refund rights for paid non-delivery, materially late unusable delivery or an uncorrectable material error remain as stated in the Terms.
Not the right door? An owner or OPM wants these findings before the set is advertised, while a correction still costs an addendum. A set still in design at 60, 75 or 90 percent is a design-stage review, the same three reports at the same price.
Start with the free report.
Request access to discuss your next set. Prelaunch requests are estimates only, not an order, authority to start report analysis or a delivery commitment. Nothing to install; sign in with a one-time code sent to your work email.