Designer — design-stage QA/QC review

See what a bidder will find, while you can still change it.

An independent read of your set at 60, 75 or 90 percent — coordination, completeness, conflicts and whether it can be bid consistently. Not a critique of the design. A second pair of eyes on the documents before anyone is pricing them.

Public and private construction projects nationwide.

What we find

Eight ways a set gets questioned after it is issued…

The same eight checks a bidder’s estimator will run, run earlier and handed to you instead.

01

Owner document readiness

Missing sections, an unreissued spec index, an addendum that moved the drawings but not the schedule.

02

Change-order prediction

Potential deferred or conflicting scope, document-indicated existing conditions and cost-allocation questions. Not verification of concealed physical conditions or a determination of change-order entitlement.

03

Biddability

Where the language is too loose to price, each bidder guesses differently — and the spread in the bid tab is not competition, it is confusion.

04

Claims

Apparent inconsistencies, notice provisions and record requirements to clarify with the project team or advisers; not a legal opinion or claim-entitlement decision.

05

Constructability

What is unbuildable as drawn comes back as an RFI, then as a change order.

06

Schedule

Long-lead items, phasing through an occupied building, and whether the calendar was drawn from the work or from a promise.

07

Extended general conditions

Delay-related provisions, rate assumptions and document gaps that may affect extended general conditions; not a cost estimate or future time-extension valuation.

08

Financial

Potential cost drivers and supporting sources. Full may include eligible per-finding historical ranges with basis and limitations, or a withholding reason; not project-specific estimates.

Document-based accessibility review and any jurisdiction-specific procurement checks are limited to supported requirements and editions identified in the accepted order. Coverage, reference sources, assumptions and unresolved applicability are stated; nationwide consideration is not a promise of every jurisdiction-specific review or professional certification.

The standard

A finding only reaches your report if it clears all three.

Real

Cited to a page. If we cannot point at it in your documents, it does not ship.

Material

It moves money or time. Interesting is not the bar; expensive is.

Non-obvious

Your own back-check would not have caught it. We do not bill you for what you already know.

Everything else is suppressed. We would rather send you four findings you act on than forty you scroll past.

How it works

Three steps, before you issue.

  1. 01

    Send us the set

    Drawings, specifications and the front end at 60, 75 or 90 percent — however you have them. Drag the folder into the portal. No formatting, no file naming, nothing to learn. Large sets upload in pieces and resume if your connection drops.

  2. 02

    We read the whole set with Nemesis™

    Each drawing against each specification section, and the front-end documents against both. Nemesis™, our own software, reads the set across all eight checks above — then a person clears each candidate finding against the real / material / non-obvious standard before it reaches you.

  3. 03

    You revise, or you do not

    The outputs included in the purchased tier, with human review and approval before delivery. Paid reports cite findings and potential implications; Full adds qualified historical ranges, the takeoff and draft clarifications for your team's review. Design decisions remain with the responsible authorised professional. The report goes to you, not to the owner, unless you say otherwise.

Pricing

One price per bid set. No subscription.

The same three tiers and base prices, whether the set is at 60, 75 or 90 percent or out to bid. For an equivalent accepted document scope, the analytical review process is the same; tiers change the released deliverables. First pass is a summary, not the complete paid report. All tiers open together only after the complete promised scope is verified ready. Until then, requests are estimates only, not orders or delivery commitments. A request, upload or account approval alone is not an accepted engagement.

What each tier includes, by tier
First passFREEStart with the summary findings. Basic$1,995/setSee everything we found, and where it is. Full$4,995/setReview findings, quantities and draft clarifications.
The verdict
Summary of apparent biddability issues ✓ ✓ ✓
How many material findings the set carries ✓ ✓ ✓
Readiness review indicator or explanatory status Indicator / status Indicator / status Indicator / status
The findings
Each finding named and cited to the drawing and spec section – ✓ ✓
Potential cost, schedule and responsibility issues – ✓ ✓
Sorted into the three categories, severity ranked within each – ✓ ✓
Document-based accessibility review against requirements and editions identified in the accepted order – ✓ ✓
Eligible historical range per finding, or a withholding reason – – ✓
What to do about it
Draft RFIs, clarifications and priority suggestions for customer and professional review – – ✓
Complete, self-verified quantity takeoff for the accepted scope – – ✓
Supported jurisdiction-specific procurement document checks identified in the accepted order – – ✓
One consolidated original-scope addendum reread; conditions below – – ✓
Delivery from completed intake 2 business days 5 business days 10 business days
Start free Choose Basic

Bigger sets

How the price steps on a set larger than the standard size
Up to 100 drawings / 1,000 specification pagesIncluded
101–150 drawings, or 1,001–1,500 specification pages+ one tier
151–200 drawings, or 1,501–2,000 specification pages+ two tiers
Each further band+ one tier

Before acceptance, we confirm verified counts, the size basis, any discount and the total fee. When drawings and specifications are both oversized, only the larger overage is charged. Accepted orders are not retroactively repriced.

You create an account once and it stays. Each bid set after that is priced on its own — there is nothing to cancel, and nothing renews. Business days run Monday through Friday, excluding observed U.S. federal holidays, in Eastern time. Completed intake means we have received and checked the agreed set and necessary information; the intake day is excluded. Before acceptance, we confirm a firm delivery date and feasibility against your disclosed bid, RFI or other deadline. Delivery is due by the end of that Eastern-time date unless an earlier time is agreed. There is no silent clock reset for retries, queues or reoffers; material changes require agreement. Delivery requires the approved report and required files by email, or accessible through the portal with notification. Incomplete files are not delivery.

A readiness score is a review indicator based on stated findings, coverage and scoring method, not a probability, completeness guarantee or prediction of project performance, and not a compliance certification. An explanatory status or withholding reason replaces a score whose basis is incomplete or misleading. No reported issue does not mean no issue exists. Full-only historical ranges describe the middle 50 percent of positive executed change-order amounts assigned to the relevant kind of change, with basis and limitations; they are not a project-specific estimate or a likelihood. A range is withheld without adequate eligible support. Finding ranges may overlap, must not be added and provide no aggregate exposure total, bid allowance or entitlement.

Full includes the complete, self-verified quantity takeoff for the accepted scope: included trades, document versions, units, measurement basis, assumptions, inclusions, exclusions, verification results and unresolved issues, in a ledger/workbook with supporting drawing evidence and a report summary. Self-verification is internal, not an independent certification and not a cost estimate; check quantities and assumptions before use. It cannot be labelled complete with unmeasured required scope or a blocking verification issue. Full also includes one consolidated addendum submission received within 30 calendar days after original report delivery, limited to the original accepted scope and its effects on the original findings and deliverables, with its delivery date agreed before starting. Redesign, new scope or further separate submissions require a new accepted quote. Correction of our own errors is separate and free and does not use up this reread. We correct our errors promptly; applicable refund rights for paid non-delivery, materially late unusable delivery or an uncorrectable material error remain as stated in the Terms.

Not the right door? A set still in design at 60, 75 or 90 percent is a design-stage review, the same three reports at the same price. A contractor pricing a set that is already out to bid reads the same documents from the other side of the table.

Working with us

Where our work stops, and where your documents stay.

What we are not

Pythagoras provides construction document analysis and risk identification, not legal advice, claim entitlement, a cost estimate or licensed design services. Document-based accessibility and procurement checks cover only supported requirements and editions identified in the accepted order, with coverage, assumptions and unresolved applicability stated. They are not a compliance certification or site inspection. Draft RFIs, clarifications and priority suggestions require customer and professional review for facts, project context, contract requirements and deadlines before submission. We do not authorise a claim or a design or procurement-document change. The review covers the accepted document versions, not ongoing monitoring or later addenda unless agreed.

Your documents stay protected

Necessary service processing may include external AI-assisted analysis, with confidentiality and purpose restrictions. Project materials and reports are not sold or licensed to marketing or data buyers. Service processing does not authorise unrelated use or general-purpose model training. Any limited abstract lessons must meet the governing agreement's restrictions and recorded human review; broader customer-derived reuse requires separately verified permission and rights.

Send us a set

The cheapest time to fix it is now.

Request access to discuss your 60, 75 or 90 percent set. Prelaunch requests are estimates only, not an order, authority to start report analysis or a delivery commitment. Nothing to install; sign in with a one-time code sent to your work email.

Not ready to send a set?

Before the Bid.