Client Portal
Owner / OPM — bid-readiness review

Find the gaps before the contractor does.

Every ambiguity you eliminate before advertisement is a change order nobody ever writes. We read your set the way a contractor’s estimator will, and hand you the list while there is still time to reissue.

Public and private construction projects nationwide.

What we find

Eight ways a bid set costs you money after award…

The same eight checks either way, read from your side of the table. A contractor looks for these to price them. You want them gone.

01

Owner document readiness

Whether the package is fit to go to market at all. Missing sections, an unreissued spec index, an addendum that moved the drawings but not the schedule — the things that draw a bidder question the day after you advertise.

02

Change-order prediction

Potential added-cost drivers in deferred or conflicting scope, document-indicated existing conditions and cost-allocation clauses. Findings identify questions for the project team, not verified concealed conditions or a change-order entitlement.

03

Biddability

Can this set be bid consistently and fairly? When the language is too loose to price, each bidder guesses differently — and the spread in your bid tab is not competition, it is confusion.

04

Claims

Apparent inconsistencies, notice provisions and record requirements that may warrant clarification before advertisement. This is not a legal opinion or a determination of which party would prevail.

05

Constructability

Whether it can actually be built efficiently: diagrammatic drawings, constrained existing space, and trades routed into each other. What is unbuildable as drawn comes back as an RFI, then as a change order.

06

Schedule

Is the work realistic within the contract time? Long-lead items, phasing through an occupied building, and whether the calendar was drawn from the work or from a promise.

07

Extended general conditions

Delay-related provisions, rate assumptions and document gaps that may affect extended general conditions. This is not a project cost estimate or the valuation of a future time extension.

08

Financial

Potential cost drivers and their supporting documents. Full may include eligible per-finding historical ranges, with basis and limitations, or a withholding reason; these are not project-specific estimates.

How the findings come back

Three categories, severity ranked within each.

Released findings are named, cited to their sources and sorted into one of three categories, severity ranked. Readiness indicators or explanatory statuses describe the findings and coverage; they do not certify the set or predict its outcome.

Category 1

Contract, commercial and administrative

The bid procedure, the contract terms and the front-end documents — what governs the award and how the contract is administered once it is signed. Low risk for cost impacts.

Category 2

Document errors with no cost impact

Mistakes in the set that cost nothing to correct but cost a bidder time to resolve: a stale index, a wrong sheet reference, a section that contradicts its own title. Low risk for cost impacts.

Category 3

Cost, procurement, schedule and scope

Anything that moves money, the calendar, the scope or the way the work is procured. These are potential cost impacts. Full includes a historical range only where eligible support is adequate; otherwise the range is withheld with a reason.

The standard

A finding only reaches your report if it clears all three.

Real

Cited to a page. If we cannot point at it in your documents, it does not ship.

Material

It moves money or time. Interesting is not the bar; expensive is.

Non-obvious

Your designer would not have caught it in a normal back-check. We do not bill you for what your own review already found.

Everything else is suppressed. We would rather send you four findings you act on than forty you scroll past.

How it works

Three steps, before you advertise.

  1. 01

    Send us the set

    Drawings, project manual, front-end documents — however you have them. Drag the folder into the portal. No formatting, no file naming, nothing to learn. Large sets upload in pieces and resume if your connection drops. Before order acceptance, we verify the drawing and specification counts and confirm the document scope, fee and feasible delivery date. Uploading is not an accepted engagement.

  2. 02

    We audit the entire package with Nemesis™

    Each drawing against each specification section, the front-end documents against both, and each addendum against what it was meant to change. Nemesis™, our own software, reads the whole set across all eight checks above — then a person clears each candidate finding against the real / material / non-obvious standard before it reaches you.

  3. 03

    You reissue, or you do not

    The purchased tier determines the released outputs. Paid reports cite findings, categories and potential implications; Full adds qualified historical ranges, a takeoff and draft clarifications. Your project team reviews the supporting documents and decides what to clarify, amend or refer for professional advice.

What we are not

Pythagoras provides construction document analysis and risk identification, not legal advice, claim entitlement, a cost estimate or licensed design services. Document-based accessibility and procurement checks cover only supported requirements and editions identified in the accepted order, with coverage, assumptions and unresolved applicability stated. They are not a compliance certification or site inspection. Draft RFIs, clarifications and priority suggestions require customer and professional review for facts, project context, contract requirements and deadlines before submission. We do not authorise a claim or a design or procurement-document change. The review covers the accepted document versions, not ongoing monitoring or later addenda unless agreed.

Pricing

One price per bid set. No subscription.

Review potential scope and coordination issues before advertisement. Earlier clarification can reduce uncertainty; no finding count, saving or project outcome is guaranteed.

For an equivalent accepted document scope, the analytical review process is the same; tiers change the released deliverables. First pass is a summary, not the complete paid report. All tiers open together only after the complete promised scope is verified ready. Until then, requests are estimates only, not orders or delivery commitments. A request, upload or account approval alone is not an accepted engagement.

What each tier includes, by tier
First passFREEStart with the summary findings. Basic$1,995/setSee everything we found, and where it is. Full$4,995/setReview findings, quantities and draft clarifications.
The verdict
Summary of apparent biddability issues ✓ ✓ ✓
How many material findings the set carries ✓ ✓ ✓
Readiness review indicator or explanatory status Indicator / status Indicator / status Indicator / status
The findings
Each finding named and cited to the drawing and spec section – ✓ ✓
Potential cost, schedule and responsibility issues – ✓ ✓
Sorted into the three categories, severity ranked within each – ✓ ✓
Document-based accessibility review against requirements and editions identified in the accepted order – ✓ ✓
Eligible historical range per finding, or a withholding reason – – ✓
What to do about it
Draft RFIs, clarifications and priority suggestions for customer and professional review – – ✓
Complete, self-verified quantity takeoff for the accepted scope – – ✓
Supported jurisdiction-specific procurement document checks identified in the accepted order – – ✓
One consolidated original-scope addendum reread; conditions below – – ✓
Delivery from completed intake 2 business days 5 business days 10 business days
Start free Choose Basic

Bigger sets

How the price steps on a set larger than the standard size
Up to 100 drawings / 1,000 specification pagesIncluded
101–150 drawings, or 1,001–1,500 specification pages+ one tier
151–200 drawings, or 1,501–2,000 specification pages+ two tiers
Each further band+ one tier

Before acceptance, we confirm verified counts, the size basis, any discount and the total fee. When drawings and specifications are both oversized, only the larger overage is charged. Accepted orders are not retroactively repriced.

You create an account once and it stays. Each bid set after that is priced on its own — there is nothing to cancel, and nothing renews. Business days run Monday through Friday, excluding observed U.S. federal holidays, in Eastern time. Completed intake means we have received and checked the agreed set and necessary information; the intake day is excluded. Before acceptance, we confirm a firm delivery date and feasibility against your disclosed bid, RFI or other deadline. Delivery is due by the end of that Eastern-time date unless an earlier time is agreed. There is no silent clock reset for retries, queues or reoffers; material changes require agreement. Delivery requires the approved report and required files by email, or accessible through the portal with notification. Incomplete files are not delivery.

A readiness score is a review indicator based on stated findings, coverage and scoring method, not a probability, completeness guarantee or prediction of project performance, and not a compliance certification. An explanatory status or withholding reason replaces a score whose basis is incomplete or misleading. No reported issue does not mean no issue exists. Full-only historical ranges describe the middle 50 percent of positive executed change-order amounts assigned to the relevant kind of change, with basis and limitations; they are not a project-specific estimate or a likelihood. A range is withheld without adequate eligible support. Finding ranges may overlap, must not be added and provide no aggregate exposure total, bid allowance or entitlement.

Full includes the complete, self-verified quantity takeoff for the accepted scope: included trades, document versions, units, measurement basis, assumptions, inclusions, exclusions, verification results and unresolved issues, in a ledger/workbook with supporting drawing evidence and a report summary. Self-verification is internal, not an independent certification and not a cost estimate; check quantities and assumptions before use. It cannot be labelled complete with unmeasured required scope or a blocking verification issue. Full also includes one consolidated addendum submission received within 30 calendar days after original report delivery, limited to the original accepted scope and its effects on the original findings and deliverables, with its delivery date agreed before starting. Redesign, new scope or further separate submissions require a new accepted quote. Correction of our own errors is separate and free and does not use up this reread. We correct our errors promptly; applicable refund rights for paid non-delivery, materially late unusable delivery or an uncorrectable material error remain as stated in the Terms.

Not the right door? A set still in design at 60, 75 or 90 percent is a design-stage review, the same three reports at the same price. A contractor pricing a set that is already out to bid reads the same documents from the other side of the table.

Send us a set

Start with the free report.

Request access to discuss the set you plan to advertise. Prelaunch requests are estimates only, not an order, authority to start report analysis or a delivery commitment. Nothing to install; sign in with a one-time code sent to your work email.

Not ready to send a set?

Before the Bid.

Sign up for our newsletter to stay in the know.